Hardcover room inspection home have to know the precautions

It is believed that the owners who purchase the hardcover rooms must be very excited when they face new houses. However, when checking homes, they often check out a lot of problems. After all, the money is not a wind blow. Therefore, the editors here provide a small experience for homeowners to write an inspection room for a hardcover room. One Ms. Xu encountered such a problem after buying a new house. "I bought a new house. It was a finely decorated house. I had taken the house for six months. I just got in a few days ago. The furniture hasn't been completely sorted out. But yesterday, suddenly the bathroom's one tap was broken, causing the water in the house to be deep and the furniture to be damaged. Part of the wall latex paint has been yellowed.” “There is another problem today, the gas stove can not reach the fire, this is also a list of fine decoration room decoration. I now suspect that the developer is using poor quality decoration materials. This series of problems resulted." "They also promised to help us to repair it, but because it was a new house, they hadn't stayed for a few days and it was a series of serious quality problems. Can I ask these questions to developers or properties? Claims?" General rough room will have a lot of problems, not to mention the hardcover house! That's right, Jianchuang room no longer has to worry about complicated decoration. However, in order to avoid problems like Ms. Xu, how can we inspect the house?
Home inspection preparation 1, with drawings: As long as there are drawings of the size of the room type should be prepared in advance, of course, the floor plan of the house, the circuit, waterway drawings must also be prepared, group number inspection room preparation. 2. Key: The key is very important. Floor keys, door keys, water meters, and meter keys must all be collected.

3, decoration materials confirmation form: to facilitate inspection of the room to check the material brand, style and model. Points and precautions
1. In addition to checking the area, checking the orientation of the location, measuring the common area, and whether the balcony is closed, the acceptance structure should check whether the floor height is in line with the developer's commitment. 2, inspection "water"
The quality of the sanitary ware in the hardcover room is also very different. The first time the owner inspects the house, it depends on whether the brand is consistent with the agreement, and the second is whether the drainage is smooth. The bathtub should pay attention to whether it is installed firmly or not. In addition, the water connection pipe is a hose. Its length should be of a moderate size, and it should be inserted into the floor drain. Otherwise it may easily lead to water retention in the bathtub.
Check the bathroom for waterproofing. You can use plastic bags to fill the sand and put it on the floor drain. Then put some water on it. After 24 hours, check to see if there is any leakage. PS: The toilet exhaust hole should also pay attention to, you can lift the ceiling to check whether the pipeline is in place. 3, inspection "electricity" 1, the distribution box, "two-way power supply, lighting, power system shunt" is the most basic requirements.
2. When checking the electricity, pull the gate to see if it is completely powered off; then close the gates separately and see if each branch line is easy to use.
3. Check whether the socket outlets of each house are powered on, whether the telephone jack, the broadband jack, the TV antenna jack, and the emergency socket are unobstructed.
4. Check the reserved air-conditioning pipeline passages. 4, acceptance days, ground, wall
1. Check whether the ground is flat 2. Pay attention to whether the corner line is straight 3. Check whether there is empty drum under the wall 4. Check whether the connection between the buckle boards is consistent 5. Check whether the floor's overall footing is consistent 6. Check whether the floor is up Alice, Whether it is hollow ps: walk slowly in each room, listen carefully to hear the sound. 7, the wall inspection should pay attention to leaving the location of the air conditioning hole. 5, acceptance of windows and doors windows need to pay attention to three elements: First, the brand, the second is the locks, and the third is a solid case. Is there an insulating glass? In addition, you need to look at the lock on the window, and check the integrity of the screen if you have installed the screen.
When detecting the security door, see if the brand of the security door is consistent with the contract.
Whether the right-angled joint of the door is tight or not, whether the wooden door is cracked, and whether it is automatically locked or opened if it is not locked. Ps: Also pay attention to whether the marble on the windowsill cracks. This series reminds: If you find a problem during the acceptance of your house, you must make sure that the developer stamps and confirms the formulation of the treatment plan. If the developer refuses to confirm the housing problem, he must always obtain evidence.

House inspection and acceptance of water and electricity

Oil & Gas Injection Package

Methanol Injection Skid:

*safety control with remote control system

*compact and space saving design

*improved working condition, and also provide excellent services life

*All kinds of brand, material and parts can be available with different projects.

* The integration system design, overcomes the defect of only the signal units.

* Customised design to meet of the requirement of different demand.

* Both manual control & remote control can be as the optional.

Oil Injection Package,Gas Injection Package,Pneumatic Chemical Injection Package,Gas Chemical Injection Package

Zhejiang Ailipu Technology Co., Ltd. , https://www.alipu.com