Which nodes need acceptance in waterproof engineering?

Waterproof engineering is related to the feelings of life in the future, so it is not sloppy. Waterproof construction process is divided into several nodes, then what time is the need for acceptance? This article tells the owners that although the whole process does not need to be stared at every day, these nodes still need to pay attention, let's look at it together!

A, waterproof acceptance node

1, one by one acceptance

In the general bathroom renovation process, a closed water test will be conducted. However, after the completion of the project can not ignore the acceptance, all the bathrooms must be carried out one by one acceptance.

2, after the construction process inspection

Every process before the construction of the waterproof layer (primary layer treatment, hole cleaning and plugging, leveling layer construction, filling and sealing grease, detailed additional layer, etc.) is completed, and can only be performed after the inspection engineer confirms and confirms the inspection record. Road construction.

3, after the acceptance of waterproof brushing

Each time the water-coating layer is brushed and checked by the supervising engineer to confirm compliance with the requirements, the next pass of the waterproof layer can only be applied.

4, after the waterproof layer brushing dry need acceptance

After the waterproof layer is completely dried, the quality of the waterproof layer shall be carefully inspected and checked. The inspection shall include whether the waterproof layer is full of paint, whether the thickness is uniform, whether the sealing is tight, and whether the thickness meets the design requirements (slicing and sampling). Cracking, Alice and other defects. After the joint inspection and acceptance by Party A and the supervision engineer, the closed water test can be conducted.

5, waterproof closed water experiment

Waterproof layer must be closed water test, the test time is not less than 24 hours, in the bottom of the floor, the surrounding pipeline and other parts of the wall and other parts shall not appear water seepage, moist phenomenon. After Party A and the supervising engineer jointly check the acceptance and handle the concealed inspection and acceptance records, the construction of the waterproof protection layer of the next process can only be completed.

6, after the completion of renovation waterproof acceptance

After the construction of the waterproof coating film protection layer is completed, the fine-decoration bathroom shall be constructed after the completion of the plumbing professional pipeline and the experience is accepted. The equipment and civil engineering disciplines shall cooperate closely during the process handover.

7. Secondary water closure test

After completion of the bathroom floor finish, a second water-sealing test shall be conducted. The closed water time shall be no less than 24 hours. During the period, no leakage or moisture shall be observed at the bottom of the floor, at the corner of the wall, or at the periphery of the pipeline. , At the same time fill in closed water inspection records and follow the procedures for waterproof construction acceptance.

Hydropower installation hydropower acceptance hydropower reform

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Carbon Electrode Paste is produced by putting petroleum coke and asphalt into melting tank to dehydration, melt, then adding them into kneading pot to kneading, molding and sintering. 

Fully automated batching, crushing, mixing, kneading, molding, quality assurance, strict control of ash content, volatile, ensure low resistance and high strength.

Materials:Calcined Anthracite Coal,CPC,Anode Scrap,Coal pitch,Coal Tar,Graphite Powder.

Shape:Cylinder,Egg,Trapezoid.

Application:Used in soderburg furnace to make Various alloy, such as Ferro silicon, ferro manginess, ferro silicon manganese,nickel alloy, Chromium alloy.

Electrode Paste

Electrode Paste,Electrode Paste Standard,Airtight Electrode Paste,Special Carbon Electrode Paste

Carbographite Industrial PTE.LTD , http://www.carbographite.com