What are the precautions for decoration acceptance? Basic steps for decoration acceptance

The decoration of the house is too wide. We can't finish it ourselves, so the best way is to invite a professional construction team. This is not only professional, but also fast. Generally speaking, please apply, we should Stare well, avoid being lazy, but it is too much trouble, in fact, we only need to be careful at the final acceptance, there is no problem. Of course, we must first find those construction teams that have good evaluation, then what are the precautions for decoration acceptance ? What? The following decoration home network will introduce to you.


装修验收注意事项


First, what are the precautions for decoration acceptance?


1, wall appearance inspection

The cracks on the wall and the appearance of the slab are the focus of the owners when they are reposing the building and must be taken seriously. Generally, it is important to check whether the load-bearing wall and the floor have stress cracks; whether the color of the wall has serious color difference.


2, wall vertical flatness check

The inspection of the corner deviation and the vertical flatness of the wall is very necessary. In addition to the aesthetic appearance of the wall of the house, these two indicators can also check whether the structure of the wall is problematic.


3, check the corner deviation value

The multi-function inner and outer right angle measuring ruler can detect the deviation of the right angle inside and outside the wall (yin and yang). Generally, the ordinary plastering wall surface deviation is 4mm, and the brick surface deviation is 2mm.


4, wall hollow inspection

There may be an empty drum on the plastered wall and the tile surface. Therefore, it is necessary to carefully observe and inspect the hollow phenomenon of the wall surface, so as to avoid the occurrence of wall ash and tile falling off in the future life.


5, the ground appearance inspection

After laying the floor and floor tiles, it is easy to scratch or damage the surface due to careless construction. Therefore, when accepting the ground decoration, it is first necessary to check the appearance of the ground to see if there are any problems such as chromatic aberration, cracks and gaps.


6, check the ground empty drum situation

Floor and floor tiles appear empty, if not treated, it will lead to loosening and falling off in the future. Therefore, after checking the empty drum position, it must be repaired immediately.


7, water supply engineering inspection

Water supply engineering inspections should pay attention to check the quality and water supply. At the time of acceptance, it is necessary to check the quality and installation position of the faucet, valve, water meter, etc., and check whether the water is normally passed.


8. Drainage engineering inspection

Drainage engineering acceptance should include quality inspection and drainage inspection. The quality of the floor drain, drain and drain pipe must be strictly checked and the drainage checked for normality.


9. Electrical engineering decoration acceptance

The electrician's acceptance mainly includes several parts: electrical box, electrical appliances, switches and sockets. The following are electrical switch sockets installed for the living room and kitchen. The electric meter box installation of the bedroom and balcony is checked and accepted.


装修验收注意事项


Second, the basic steps of decoration acceptance


1, the material acceptance is not fine

The first step in the acceptance work is to accept the materials. When the formal decoration company signs a contract with the customer, it will also sign a material description sheet detailing the brand, specification and quality level of the required materials. Both parties should accept the materials according to the material description sheet.


2. Key acceptance and concealment works

According to the supervision engineer, when the concealed project is completed or completed, a mid-term key acceptance is required, which is especially important for ensuring the overall quality of the home decoration. Whether the acceptance is qualified will affect the subsequent construction of multiple home improvement projects.


3, completion acceptance and meticulous

Completion acceptance is the last step in the acceptance of the home improvement project. The supervision engineer reminds the consumer that all the details agreed or not agreed in the contract are found in time and should be as detailed as possible. If there is a lack of understanding of the home improvement project, consumers can also ask a professional or a third-party acceptance agency to assist in the acceptance.


Xiao Bian here reminds everyone that while we attach importance to acceptance, we should not neglect the problem of material selection. Only the decoration materials have no quality problems, which is the basis for ensuring the smooth completion of the decoration. The above-mentioned decoration acceptance for everyone is very detailed, and everyone can be used as a reference for actual cases. For more exciting home improvement information, please continue to pay attention to the decoration home network.


More related wonderful reading:

How to correctly check the woodworking decoration? Woodworking decoration acceptance criteria

How to do bathroom waterproof decoration? Bathroom waterproof decoration acceptance

What is the acceptance criteria for the decoration?

How to check the bathroom decoration? Bathroom fitting acceptance specification

How to check the full decoration room? Decoration acceptance points

Maijin Lock SPC Flooring has been selected food grade resin raw materials,the material is often used in medical treatment things and food package, because this has extremely high safety, suitable for gravida,children and other weak resistance people to use, very healthy.Wear layer selected the best domestic suppliers.The family used products are mainly wear layer 0.3 mm, its coating has been processed many times, which can be used for 10 years. Used wear layer 0.7mm of the product can improve the service life (according to the the crowded environment, the service life is increased by 2-3 years on average).

Lock Spc Flooring

Lock Spc Flooring,Spc Vinyl Flooring,Healthy Lock Spc Flooring,High Safety Lock Spc Flooring

Dalian Huimingmaijin New Materials Co.,Ltd , https://www.maijinfloor.com